State of the physical plant - report by Roger Ruppert
for the Aug. 31 parish Pastoral Council

FIRST PRIORITY: Church heating system
in need of re-piping of the Suydam St. side system, located in the parish hall. Approximate cost $15K.  Soon, the Saturday Morning Crew will cut out the bad pipe.  The long-term plan is to look into switching from
the current steam system to hot water.  Ray Jolly and Joe Nastus will
be consulted.

OTHER AREAS
Church
--fans not functioning.
--choir loft
Church exterior
-- brownstoning (Saturday morning crew)
-- front doors, stripped and refinished,
-- front steps
--church windows need to be painted and repaired (epoxy)
--gutters cleaned
-- painting on the front of the church
Parish Hall 
--landing
Parking Lot
--Curbs reinforced